GPS Tracking

Real-time location of all your equipment in the field

Track the location of your personnel and equipment with precise GPS. Optimize routes, validate on-site execution and maintain geolocated evidence of each activity.

GPS tracking interface in CheckOp for monitoring field operations and teams in real time
GPS tracking interface in CheckOp for monitoring field operations and teams in real time

Companies that trust CheckOP

  • logo-progresus-assent
  • logo-lavanti-assent
  • Logo-AMC

The real problem

Without geographic visibility, you lose operational control

Lack of GPS tracking creates costly problems in field operations:

15-20%

Loss of productivity due to inefficient travel

The real cost

Time lost in calls to confirm location and ETA (Estimated Time of Arrival)

Inability to verify whether the service actually ran on site

Disputes with customers over schedule compliance

Inefficient routes that waste fuel and time

bg-waves-1
Your solution

View the current location of all your equipment on a single map

Geolocation map in Checkop showing real-time location and routes of field teams

Intelligent GPS: Location, device status and proximity

View real-time location and equipment batteries, assign tasks by proximity in one click, and receive proactive alerts for location or permission changes.

Your solution

Immediate response to new services

Manage urgent services by locating available technicians on the map, comparing arrival times in real time and assigning the task to the best positioned for quick attention.

GPS tracking in Checkop with instant response to locate and supervise field operations
GPS tracking in Checkop with instant response to locate and supervise field operations
Complete history of routes and locations in CheckOp for analysis and tracking of field operations
Complete history of routes and locations in CheckOp for analysis and tracking of field operations
Your solution

Complete transaction history

CheckOP records complete GPS routes per task, allowing you to replay runs, validate execution, analyze efficiency and support operational audits or disputes.

GPS integrated with your entire operation

GPS tracking is not a stand-alone feature. It is integrated with task management, forms, reports and notifications.

Android App Tracking

Display exact location and movement by odometer in real time

Proximity Search

Locates available technicians within a specific radius of a point or customer.

Map Assignment

Immediately delegate tasks to personnel closest to the service.

Route Audit

Cross-reference the assigned task points against the places actually visited.

Battery Levels

Monitors the charge percentage and connection status of each device.

Permit Alerts

Detects inactive GPS or missing permissions and notifies for immediate correction.

Case Study

Visibility and control of technical personnel in the field

We strengthen the operational coordination of the industrial sector.

GPS-based tracking of field equipment in CheckOp for operational control and monitoring
  • Technicians monitored

    +0/assets
  • Route compliance

    0%

Proximity task assignment and route auditing

An industrial equipment maintenance company uses CheckOP's GPS tracking to monitor in real time the location and movement of its technicians in the field.

From the map, coordinators identify the closest personnel to each customer, assign tasks immediately and validate that scheduled visits are executed at the correct locations, ensuring operational control and complete traceability.

See case study

For large equipment or specific needs

Find the answers you need

The system collects equipment location data in the field and displays it in real time on an integrated map, enabling efficient monitoring and analysis.

CheckOP optimizes power consumption using smart refresh: high frequency only during motion, low when static.

The app stores locally the last known points and completes the history when it recovers signal. Geofencing works with last known point.

Yes, however if a technician deactivates it, an alert is generated to the supervisor and recorded in the system.

Control is flexible and depends on your operation. For constant tracking (movement on map), it is your organization that defines internally whether staff should keep it active; the platform will always show you who is reporting and who is not. On the other hand, for the execution of tasks, you can configure your forms so that location registration is mandatory. This way you ensure that the technician is in the right place before completing a service.

Indoors, accuracy may be reduced. CheckOP complements with WiFi positioning when available. For these cases, geofencing with wide radius (100-200m) works well.